This page shows examples of past project activities. All examples are sanitized with a short decription of project and outcome
Sector The workshop supported almost every industrial sector using advanced material processing
Duration 18 months
Outcome Goal achieved through removing staff from toxic and dangerous manufacturing processes by introducing automation and process monitoring. Thereby meeting standards, satisfying local authorities and providing first time right manufacturing. i.e. significantly reducing cassation.
Translate and explain manufacturing method from foreign supplier to costumer for two items
Sector Defense
Duration 3 months
Outcome Goal achieved with the advantage of insourcing and increased turnover
Develop, validate and scale up hydrogen electrode technology
Sector Energy
Duration 3 years
Outcome Demonstrated superior efficiency on lab scale product using a low-cost and production friendly method. This was scaled up 600 times to meet machine requirements.
Later in another project it was scaled up 15000 times.
Establish a job-solving network within AM covering all methods and materials
Sector All/Manufacturing in general
Duration 6 months
Outcome Created a business within the business with a strong competitive edge since the tool box was complete. Fast moving order processing.
Determine possible repair method and qualify approach for costly and sensitive components
Sector Transportation
Duration 3 months
Outcome Method identified and qualified by full documentation. Overall win: leadtime reduced by 95%, performance doubled. And that was to half of the original component costs.
Confirm quality level when introducing new manufacturing method
Sector Defense
Duration 18 months
Outcome Successful despite of limited information. But that changed giving the opportunity to demonstrate a significant reduction in manufacturing time, increased flexibility and supporting a sustainability agenda as well. This led to several other similar activities.
Determine and execute best posible repair method for a device in agresive environment
Sector Pharma
Duration 1 week
Outcome Difficult task under acute conditions which led to support from network and using very old but durable methods.
Establish a transformation strategy respecting legacy
Sector Several
Duration 2 months
Outcome Full business plan presented which included re-focus investments, closing of old activities, route to market, and a marketing campaign. The plan was upon approval successfully executed.
Introduce new friction surface and improve quality
Sector Wind & Maritime
Duration 6 months
Outcome Succesful development and integration backed up by surface characterization, testing process control and continous improvement.
If you want to learn more on public projects you can do so here and visit the founders personal LinkedIn profile.